Catalogue values for Online UPS (V2)
Category | Specification | Bid Requirement (Allowed Values) |
---|---|---|
Generic | Rating in KVA | 5.0 KVA |
Switching Technology | IGBT-PWM | |
Input Voltage | AC Three phase 300 V - 450V sinewave 50Hz | |
Output Voltage | AC Single phase 230V +/-1% 50 Hz | |
Warranty for UPS (Years) | 2, 3, 4, 5 Or higher | |
Battery/Backup Bank | Battery/Backup Bank Provided with Online UPS ( Hint: In case the UPS is supplied with battery, seller shall ensure compliance to the GST Rates as per recommendations made in the 45th Meeting of GST council dated 17th Sep 2021 ) | With Battery |
Type of Battery (hint: NA in case Battery not provided) | SMF-VRLA conforming to JISC:8702(Pt.I,II&III), Stationary Lead Acid Batteries (with tubular positive plates) in monobloc container conforming to IS:13369:1992 latest | |
Backup time (Minutes) (hint: NA in case battery not provided) | 120 Minutes | |
Minimum Guaranteed VAH | 1600 X Per KVA X Per hour of backup time | |
Warranty for battery (Years) by Battery Manufucaturer/Brand hint: NA in case battery not provided | 2, 3 Or higher | |
Accessories with Battery | NA | |
Installation and Commissioning or Service | Installation and Commissioning ( Covered in the Scope of Supply) | Provided |
After sales service ( Turn Around Time) | Within 24 hours, Within 48 hours, Within 7 days, NA | |
Preventive Maintenance ( Hint: Mention Timeline if provided, NA if not provided) | Monthly, Bi-Monthly, Quarterly Or higher | |
Other Services provided | PAN India service support on 24 x 7 basis, AMC support available warranty, Availability of spares in close proximity (Spares should be easily available close to the site), NA | |
Performance / Functional | Inbuilt isolation transformer | With |
Overall Efficiency (%) | >/=90% & <94% without Inbuilt isolation transformer | |
Overload limit | 20% Overload for minimum 10 minute, 20% Overload for minimum 5 minute, 50% Overload for minimum 1 minute, 50% Overload for minimum 3 seconds | |
Total Harmonic Distortion(THD) (%) | 3% Maximum @ 100% Linear Load | |
Other Functional Features | Crest factor on full non-linear load is not less than 3:1, Noise level (1 meter distance from UPS) should be less than 70dB, Input power factor at full output load leading to unity with active power factor correction (APFC) >/=0.92, Transient response time (for 100% load change, output must remain within +/-1% and recovery) as <20 milliseconds, Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD : 8 to 10 Hours, Maximum overshoot and Under shoot of output rated voltage (in percentage) (4%), Voltage Regulation from no load to full load (%) (< / = 2%), UPS input power factor better than 0.95 (at rated voltage) | |
Accessories | Accessories | Rack for Batteries, Cabling 6 meters ( input upto 3m and output upto 3m), Paralleling kit (Hot Standby Configuration), Paralleling kit for synchronizing (Parallel Redundant Load Sharing Configuration), SNMP Card ( with Suitable Software ) for communication, The UPS shall be complete with Trolley for battery bank,battery, Cables and connectors etc, NA |
Salient Features | Protection | Protection for under voltage at battery terminal, Protection of Over voltage, Short Circuit & over load at UPS output terminal, Over temperature protection |
Metering | Input Voltage, Output Voltage, Input Current, Output Current, Input Frequency, Output Frequency, Input Power, Output Power, Input Power Factor, Output Power Factor, Battery Voltage and Current | |
Alarms and Indications | Indicator for Mains presence, Indicator for Battery charging and discharging, Indicator for Output Over Load with Audible Alarm, Indicator for Low Battery Voltage with Audible Alarm, Alarm for Over temperature, Alarm for Low Battery | |
Additional Features | Pure Sinewave AC Output, NA | |
Design / Construction | Type of Design / Construction | Floor Standing |
Enclosure (mm) | 1.2 mm Minimum Thickness of M.S. Sheet duly powder coated | |
Degree of Protection | IP21, IP20 Or higher | |
Other Constructional Features | Mains ON/OFF MCB, Battery ON/OFF MCB, Battery Fuse, Inverter reset push button, Static by pass facility, Manual by pass facility, Expandable rack facility, Shall be complete with rack rail kit for mounting of UPS in the rack and shall be housed in rugged enclosure made of steel sheet having 1.2 mm (minimum) thickness, aesthetically finished,duly pretreated and powder coated, UPS shall be free from workmanship defects, sharp edges, nicks, scratches, burst, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional, 1 + 1 parallel redundant configuration facility on Rack mountable UPS UPS shall supply output power and charging current at the same time, NA | |
Operating Conditions | Minimum Operating Temperature | 0, -5 Or lower |
Maximum Operating Temperature | 45, 50 Or higher | |
Relative Humidity Non Condensing at 40 deg C | 90, 95 Or higher | |
Buyer Specific Requirement | Environmental Test Report Requirements | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007), Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs, Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs, NA |
Battery Test Report | Type Test Report as per relevant governing specifications from Govt Lab/NABL accredited lab | |
Intended Applications | Critical Infrastructure, Network IT Equipment, Medical Equipment, Support for Data Centers, Network operating centers, Security operation centers, State and District centers, Command and Control center etc., across the Country to provide impetus to the e-Governance services e.g. Public food distribution, e Way bill, Counseling, e-Office, IVFRT etc., services under Digital India Programme, NA | |
Other Requirements | ROHS compliance, KW rating shall be 0.8 time of KVA rating, NA | |
Reports And Certification | Agree to provide all relevant documents Test Reports/supporting document /reports etc to the buyer at the time of bidding or on demand | Yes |
As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable | Yes (For UPS rating upto 10KVA) | |