Catalogue values for Online UPS (V2)
Category | Specification | Bid Requirement (Allowed Values) |
---|---|---|
Generic | Rating in KVA | 10.0 KVA |
Switching Technology | IGBT-PWM | |
Input Voltage | AC Three phase 300 V - 450V sinewave 50Hz | |
Output Voltage | AC Single phase 230V +/-1% 50 Hz | |
Warranty for UPS (Years) | 3, 4, 5 Or higher | |
Battery/Backup Bank | Battery/Backup Bank Provided with Online UPS ( Hint: In case the UPS is supplied with battery, seller shall ensure compliance to the GST Rates as per recommendations made in the 45th Meeting of GST council dated 17th Sep 2021 ) | With Battery |
Type of Battery (hint: NA in case Battery not provided) | SMF-VRLA conforming to JISC:8702(Pt.I,II&III), Stationary Lead Acid Batteries (with tubular positive plates) in monobloc container conforming to IS:13369:1992 latest | |
Backup time (Minutes) (hint: NA in case battery not provided) | 60 Minutes | |
Minimum Guaranteed VAH | 1600 X Per KVA X Per hour of backup time | |
Warranty for battery (Years) by Battery Manufucaturer/Brand hint: NA in case battery not provided | 2, 3 Or higher | |
Accessories with Battery | NA | |
Installation and Commissioning or Service | Installation and Commissioning ( Covered in the Scope of Supply) | Provided |
After sales service ( Turn Around Time) | Within 24 hours, Within 48 hours, Within 7 days, NA | |
Preventive Maintenance ( Hint: Mention Timeline if provided, NA if not provided) | Monthly, Bi-Monthly, Quarterly, Half Yearly Or higher | |
Other Services provided | PAN India service support on 24 x 7 basis, Availability of spares in close proximity (Spares should be easily available close to the site), NA | |
Performance / Functional | Inbuilt isolation transformer | With |
Overall Efficiency (%) | >/=90% with Inbuilt isolation transformer | |
Overload limit | 20% Overload for minimum 10 minute, 20% Overload for minimum 5 minute, 50% Overload for minimum 1 minute, 50% Overload for minimum 3 seconds | |
Total Harmonic Distortion(THD) (%) | 3% Maximum @ 100% Linear Load | |
Other Functional Features | Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD : 8 to 10 Hours, Crest factor on full non-linear load is not less than 3:1, Input power factor at full output load leading to unity with active power factor correction (APFC) >/=0.92, Noise level (1 meter distance from UPS) should be less than 70dB | |
Accessories | Accessories | Rack for Batteries, Paralleling kit for synchronizing (Parallel Redundant Load Sharing Configuration), SNMP Card ( with Suitable Software ) for communication |
Salient Features | Protection | Protection for under voltage at battery terminal, Protection of Over voltage, Short Circuit & over load at UPS output terminal, Over temperature protection |
Metering | Input Voltage, Output Voltage, Input Frequency, Output Frequency | |
Alarms and Indications | Indicator for Mains presence, Indicator for Battery charging and discharging, Indicator for Output Over Load with Audible Alarm, Indicator for Low Battery Voltage with Audible Alarm, Alarm for Over temperature, Alarm for Low Battery | |
Additional Features | Pure Sinewave AC Output | |
Design / Construction | Type of Design / Construction | Floor Standing |
Enclosure (mm) | 1.0 mm Minimum Thickness of M.S. Sheet duly powder coated | |
Degree of Protection | IP21, IP20 Or higher | |
Other Constructional Features | Inverter reset push button, Mains ON/OFF MCB, Static by pass facility, UPS shall be free from workmanship defects, sharp edges, nicks, scratches, burst, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional | |
Operating Conditions | Minimum Operating Temperature | 0, -5 Or lower |
Maximum Operating Temperature | 40, 45, 50 Or higher | |
Relative Humidity Non Condensing at 40 deg C | 90, 95 Or higher | |
Buyer Specific Requirement | Environmental Test Report Requirements | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007), Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs, Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs, NA |
Battery Test Report | NA | |
Intended Applications | Critical Infrastructure, Network IT Equipment, Medical Equipment, Support for Data Centers, Network operating centers, Security operation centers, State and District centers, Command and Control center etc., across the Country to provide impetus to the e-Governance services e.g. Public food distribution, e Way bill, Counseling, e-Office, IVFRT etc., services under Digital India Programme, NA | |
Other Requirements | ROHS compliance, KW rating shall be 0.8 time of KVA rating, NA | |
Reports And Certification | Type of lab which carried out Test of Complete Product to prove the conformity of product as per specification | NABL accredited lab |
Agree to provide all relevant documents Test Reports/supporting document /reports etc to the buyer at the time of bidding or on demand | Yes | |
As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable | Yes (For UPS rating upto 10KVA) | |